WebNov 30, 2008 · The 'kit' consists of 3 T-shaped staffs that are typically identical, although when 'fixed' sight rails are used, the 'traveller' may be constructed to a specified length. Most paving and groundworks contractors will have a set of boning rods that they can use on successive jobs, but where a large number of levels are to be established, fixed sight rails … WebDiscussion Forum : Surveying - Section 5 (Q.No. 49) Surveying. 49. A sewer is laid from a manhole A to a manhole B, 250 m away along a gradient of 1 in 125. If the reduced level of the invert at A is 205.75 m and the height of the boning rod is 3 m, the reduced level of the sight rail at B, is. 208.75 m. 202.75 m.
Civil Engineering - Surveying - Discussion - IndiaBIX
WebBoning rods and travelers 2. Sight Rails 3. Slope rails or batter boards 4. Profile boards Boning rods: A boning rod consist of an upright pole having a horizontal board at its top, … Web1. Sight rails and Boning rods 1.1 The works will be set out by the Contractor. The Contractor shall be required to fix over the centre of each manhole or where a change in direction or gradient occurs a strong timber sight rail, 150mm x 25mm with top edge placed straight and true. These shall be supported and fixed portalhealth
3A1 Lecture 11 Setting OUT - Topic 7: Setting out Aims ... - Studocu
WebTravellers and Boning Rods. A traveller is similar in appearance to a sight rail on a single support and is portable. The length from upper edge to the base should be a convenient dimension to the nearest half metre. Travellers are used in conjunction with sight rails. http://www.becbapatla.ac.in:8080/html/scheme/schemes-semII-16-17/4.Fourth%20sem/14CE403.pdf WebMay 19, 2024 · • Sight rail: Sight rails are usually offset 2 or 3 m at right angles to construction lines to avoid them being damaged as excavations proceed. 32. • Travellers … irvin holidays